Your General Contractor

Tilt-Wall Construction

Precision-engineered tilt-wall panel systems for warehouses, distribution centers, and large commercial buildings in Flower Mound and North Texas. Cost-effective, rapid construction for industrial and commercial developers.

Not a Subcontractor

Your Prime Contractor for Tilt-Wall Construction

Tilt-wall construction is the preferred building method for large-scale industrial and commercial buildings in Texas-and for good reason. Tilt-wall delivers speed, cost efficiency, and durability that traditional construction methods can't match for buildings above 20,000 SF.

As a general contractor with deep tilt-wall expertise, we manage the entire building process-not just the concrete scope. From foundation design through panel erection to final building turnover, we coordinate all trades and deliver complete tilt-wall buildings ready for occupancy.

Our tilt-wall capabilities cover industrial warehouses and distribution centers, retail big-box buildings, multi-story office and flex buildings, and specialized facilities requiring specific panel configurations. We work with structural engineers to optimize panel design, minimize construction time, and control costs.

For Flower Mound industrial development, tilt-wall construction is particularly well-suited to the large-footprint buildings that developers are targeting along the FM 2499 and I-35W corridors. Our experience with Denton County soil conditions and Flower Mound permitting streamlines the approval and construction process.

Who We Serve

  • Industrial and warehouse developers
  • Retail developers building big-box stores
  • Flex/industrial property investors
  • Manufacturing companies with facility needs
  • Self-storage developers

Important

We work directly with property owners and developers-not as subcontractors to other GCs. You get single-source accountability for your entire project.

Complete Project Delivery

What We Deliver

As your general contractor, we manage all aspects of your tilt-wall construction project-not just a single trade or scope.

1

Structural engineering coordination

2

Panel design and shop drawing production

3

Foundation and slab construction

4

Panel casting and curing

5

Panel erection and connections

6

Roof structure and deck installation

7

Building envelope completion (caulking, paint)

Our Process

How We Deliver Your Project

01

Engineering: Structural design, panel layout optimization

02

Foundation: Grade beams, footings, casting slab preparation

03

Casting: Panel forming, reinforcement, concrete placement

04

Curing: Proper curing time and protection

05

Erection: Panel lifting, bracing, structural connections

06

Roof: Steel joists/girders, roof deck, insulation

07

Closeout: Joint caulking, exterior paint, punch list

Example Project Capability

Industrial Warehouse

Location

Cross Timbers Business Park, Flower Mound TX

Client Type

Industrial REIT developer

Project Scope

120,000 SF tilt-wall warehouse with 32' clear height

Deliverables

  • 48 tilt-wall panels ranging from 24' to 48' tall
  • Reinforced concrete floor slab with FF 50/FL 30 specifications
  • Bar joist roof structure with R-30 insulation
  • 36 dock-high doors and 4 drive-in doors
  • ESFR fire sprinkler system

Frequently Asked Questions

Questions About Tilt-Wall Construction

What's the typical timeline for tilt-wall construction?

Tilt-wall construction is significantly faster than traditional methods. A 100,000 SF warehouse can be weather-tight in 12-16 weeks from foundation start. Total project completion from groundbreaking to CO typically runs 6-9 months depending on interior complexity.

What panel heights and configurations can you build?

We regularly construct panels up to 50 feet tall for high-clear industrial buildings. Multi-story configurations, complex reveals, and integrated dock positions are all within our capabilities. Panel design is optimized in collaboration with the structural engineer.

How do you handle the casting slab?

The building's floor slab is typically used as the casting bed for tilt-wall panels. This requires careful coordination-the slab must be properly cured and prepared before casting begins, and any slab repairs needed after panel erection are part of our scope.

For Developers & Property Owners

Ready to Discuss Your Tilt-Wall Construction Project?

We work directly with developers, property owners, and facility managers-not as subcontractors. Get a comprehensive bid for your commercial or industrial project in Flower Mound and North Texas.

Tilt-Wall Construction | Commercial General Contractor Flower Mound TX