Commercial drainage and stormwater management systems for developments across North Texas. Detention facilities, storm sewer, and site drainage that meet municipal and TCEQ requirements.
Sub-Bid or Direct
Stormwater management is a critical component of commercial development in North Texas. Municipal requirements for detention, water quality, and discharge have become increasingly stringent, and proper drainage infrastructure is essential for project approval and long-term performance.
As a self-performing site and concrete contractor, we construct stormwater systems as a subcontractor within site development projects or direct for owners addressing drainage problems. Our capabilities include detention ponds and basins, underground detention systems, storm sewer networks, inlet structures, and erosion control measures.
Flower Mound and Denton County have specific stormwater requirements that affect commercial development. We work with civil engineers to design compliant systems and execute construction that meets all regulatory requirements including TCEQ construction stormwater permits.
Our drainage work serves developers who need detention facilities for new projects, property owners addressing flooding or drainage problems, and municipalities with public drainage infrastructure needs.
Important
We bid this scope as a subcontractor to general contractors, and we contract directly with property owners and developers who want the concrete package handled on its own. Either way, our own crews do the work.
Self-Performed Scope
We self-perform the concrete scope on your drainage & stormwater systems project with our own crews and equipment.
Detention pond excavation and grading
Underground detention installation
Storm sewer pipe installation
Inlet and outlet structure construction
Headwalls and energy dissipaters
Erosion control and stabilization
As-built documentation
Our Process
Engineering: Drainage analysis, system design
Permitting: TCEQ SWP3, municipal approval
Excavation: Pond/basin construction, trenching
Pipe: Storm sewer installation, bedding
Structures: Inlets, outlets, headwalls
Grading: Final grading, stabilization
Testing: Flow testing, inspection
Example Project Capability
Location
Cross Timbers Business Park, Flower Mound TX
Client Type
Commercial developer
Project Scope
Regional detention and storm sewer for 20-acre commercial development
Deliverables
Frequently Asked Questions
Flower Mound requires on-site detention for most commercial development, sized to limit discharge to pre-development rates. We work with civil engineers to design detention systems that meet town requirements and TCEQ regulations.
Yes. When surface detention is impractical, we install underground detention using large diameter pipe, concrete box structures, or manufactured chamber systems. Underground detention maximizes usable site area while meeting detention requirements.
We implement comprehensive erosion control per TCEQ requirements: silt fence, inlet protection, stabilized construction entrances, and temporary seeding. Erosion control is monitored and maintained throughout construction.
Related Services
Complete site development services including clearing, grading, utilities, and infrastructure. We prepare your commercial or industrial site for vertical construction.
Learn MoreCommercial street and access road construction for developments, industrial parks, and commercial properties. From design coordination through final striping.
Learn MoreComplete commercial parking lot construction including excavation, base preparation, concrete or asphalt paving, and striping for property owners and developers.
Learn MoreFor GCs, Developers & Property Owners
We bid this scope to general contractors and work directly with developers, property owners, and facility managers. Get a comprehensive concrete bid for your commercial or industrial project in Flower Mound and North Texas.